Thanks Greg, I think the majority was limestone, but we had sections of really hard rock, I think it was granite. When we trenched for the electrical, water and drainage, it took us 8 hrs to cut 40 ft in on section. We had a total of 250 ft from the meter to the shop. My son and I took turns on...