Search results

  1. T

    Garage Power

    Okay Okay I give up. You guys have beat me into submission. An electrician had me add the second 200 amp breaker to support all of the following goodies. The electrically heated shed with lots of wood working power tools for me and the misses. I've built a several thousand gallon fish pond with...
  2. T

    Garage Power

    What is CT metering? I put in a request to BGE my power company. My understanding is they will put the new meter in for free. I just need to have everything else ready. I'm currently studying to take a test so I can become my own electrician so I can apply for permits just for my house. Just got...
  3. T

    Garage Power

    I guess I was hoping that their might be an electrician or two on this forum that may have some sound advice. Knowledge doesn't always come with a price tag, but I will consider the suggestion. Food for thought. Not every electrician is going to offer the same advice. (Good or Bad) So how does...
  4. T

    Garage Power

    Okay I'm thinking out loud here. Anyone feel free to chime in. I called my Electric company today BGE and told them that I was building a 2 story attached garage via a 54 long breezeway. I asked them about putting in a meter at the garage, They said it would be considered commercial and they...
  5. T

    DIY or hire someone?

    Are you planning on moving anytime soon? If so they go the cheap route otherwise do it right and do it once. You weren't kidding about your floor its a mess :( If you do it yourself 600 is cheap compared to how much it would cost to pay someone. I was quoted a bit over 4000 to do a 28 x 32...
  6. T

    Thank you Radiant Direct!

    Tom, I also live in Maryland and hope to break ground for my garage in another month. Plan to use radiant heat. What type of pex did you use on your floor? I was thinking about using the RHT PEX-AL-PEX from http://www.blueridgecompany.com/radiant/hydronic/452/rht-pex-al-pexmulitlayer-pipe
  7. T

    New concrete floor question

    What product is that? Is it better to wait the 28 days or try and do it within 24 hours after the pour?
Top Bottom