Search results

  1. W

    Nebraska 40x60x16 Steel Building

    I picked up some bollard covers from Innoplast. I'm happy with how they turned out. Also had a chance to put some river rock around the bury hydrant and got a load of sand for the boys' sand box. The 500 gallon propane tank was also delivered this week.
  2. W

    Nebraska 40x60x16 Steel Building

    There were a few things that factored into having those 6x8 rectangles on either side of the approach. For starters, there is a bury hydrant on the right side that I didn't want to have completely encased in concrete. Also, if we had completely concreted around the 6" bollards the concrete would...
  3. W

    Nebraska 40x60x16 Steel Building

    The embed code didn't work, so I thought I would include a still image of where we're at.
  4. W

    Nebraska 40x60x16 Steel Building

    I feel terrible that I haven't kept up on this build thread! The good news is that the project has been progressing quite nicely! The building is up, doors and windows are in, flatwork and final grading are done, and everything on the outside is pretty much wrapped up. Luckily I have an IP...
  5. W

    Nebraska 40x60x16 Steel Building

    I specifically asked both my contractor and concrete sub about a vapor barrier. They both advised against using one. Apparently the concrete guy has done it a couple times in the past and he wasn't pleased with how the concrete finished. When we built our house we had a different concrete sub...
  6. W

    Nebraska 40x60x16 Steel Building

    Since May 20 (the last time anyone was on the jobsite), we have had six days where we had rain. Some days were heavier than others, but they all caused delays in getting the floor poured. We have 8 miles of hilly gravel that can get pretty sloppy, so trying to run loaded cement trucks over them...
  7. W

    Nebraska 40x60x16 Steel Building

    The concrete sub came back on Friday 05/20 and started spreading a layer of fill sand. They also got the 2x8 forms up and braced, then they laid the 4'x4' rebar grid. They ran out of rebar so they'll have to finish the last 12 ft. on the east side when they come back to pour. I'm not sure what...
  8. W

    Nebraska 40x60x16 Steel Building

    I'm a little behind on posts, so I'll get caught up in a couple here. The plumber did make it on Thursday 05/19 to rough-in the bathroom. He brought in 1" water line under the footings and has the bathroom set for a tub/shower, stool, urinal, and sink. He put a 6" floor drain in the center of...
  9. W

    Nebraska 40x60x16 Steel Building

    The footings and anchor bolts are in. The footing and foundation plan (attached) called for different sizes of footings based on the locations of the rigid frame members. All were 42" deep with rebar cages. I would be a nervous wreck trying to get those anchor bolts aligned just right! The...
  10. W

    Nebraska 40x60x16 Steel Building

    As expected the rain pushed our concrete work back to today (Monday), but we had about .30" of rain overnight, so I didn't expect them to come today either. Needless to say I was surprised when I hopped on my IP camera this AM and saw this.
  11. W

    Nebraska 40x60x16 Steel Building

    Thanks for the pictures! That's helpful to see what a 12 ft. deep mezzanine would look like on the inside.
  12. W

    Nebraska 40x60x16 Steel Building

    The concrete sub came last night and looked things over and shot some elevations. Barring no more rain he plans to get started Thursday afternoon with the mini excavator and pour footings on Friday. However, it looks like we've got a 70% chance of rain tonight, so I'm not holding my breath for...
  13. W

    Nebraska 40x60x16 Steel Building

    We had a about .50" the night before last. Most of that system went just east of us.
  14. W

    Nebraska 40x60x16 Steel Building

    Okay, I'm looking for some advice. My plan is to have a mezzanine on one end of the shop that will go the full 40 ft. on that endwall. I'm going to rough-in for a full bath out there in addition to a closed off room and an open space under the mezzanine for workbench, tools, beer fridge, etc. I...
  15. W

    Nebraska 40x60x16 Steel Building

    The contractor and concrete sub are coming Monday evening to stake out the building. We've got a footing and foundation plan from Chief that basically calls for 36" square by 42" deep footings under each rigid frame post. Then I think the plan is for a 6" thick slab with rebar reinforcement. It...
  16. W

    Nebraska 40x60x16 Steel Building

    Just over a week ago was delivery day! I scheduled the steel and insulation to both be delivered on the same day since I would be home. As one would expect, the insulation semi showed up about 20 minutes after the steel truck, so he had to wait a bit while we unloaded the steel. Thankfully I...
  17. W

    Nebraska 40x60x16 Steel Building

    I finally pulled the trigger and I'm moving forward with a 40'x60'x16' engineered steel building from Chief Buildings! It will have a 3/12 roof with R-19 insulation, R-13 wall insulation, concrete floor, and a 14'x20' overhead door. We settled on a color called Fieldstone (tannish) for the...
  18. W

    40x60 backyard shop build

    I'm getting ready to start a 40x60x16 steel building this spring too. I plan to have a similar mezzanine but on the endwall for me. Definitely following this build!
  19. W

    Finally....the beginnings of my new shop

    Is that a 4/12 roof pitch? Getting ready to start a 40x60x16 project when the frost goes out this spring. Loved seeing the progress on this build!
  20. W

    32x24 ploe barn

    What did they seal the slab with?
Top Bottom