Almost done. Excavation, pad prep, french drain, interior floor drains, and finish work/grading ~$5k
Building with labor-$28k
Concrete-$8k
All in, this ran me ~$42k.
I have not run electricity to the garage and all I have left is to seal the floors with high gloss. Then the real work begins...