  1. J

    start of a new 30x30 building with prices.

    Some more pics for everybody. Sorry for the delay but it has been BUSY for an comercial A/C guy. Finally got some vinyl up! Plus a new roll up door. Attic access door Floored attic So where are we at on cost. I was at $6,868.29 last update. 12x9 roll up door with opener installed...
  2. J

    start of a new 30x30 building with prices.

    I paid for the concrete with was 15 yards and it cost me 1,904.00 dollars. Then I paid a guy 550.00 labor to finish it out. The slab is 4and half to 6 inches thick. Hope that helps.
  3. J

    start of a new 30x30 building with prices.

    Ok here is the new totals so far as of Saturday the 30th of July 3 rolls of roofing felt....... 39.35 13 squares of shingles.... 829.71 Trip to Lowes for Fascia board 69.84 Trip to Lowes for Lumber to face out for roll up door and a few 2x4 studs we...
  4. J

    start of a new 30x30 building with prices.

    Progress pics as of Saturday afternoon. THis is the side that me and my dad finished before 11:30 A.M. and this is how far we got after 2 rain showers and then the heat index got up to 110 at about 2 P.M. We decided to quit right here because we were afraid that we would tear up the felt...
  5. J

    What do you think about these lights ?

    Thanks for the response! I really a appreciate it. What kind of lights should I put in here? I need ideas please. Thanks again.
  6. J

    What do you think about these lights ?

    Ceiling hight will be 10 ft. Did not know that about the ballast and the amps. Was just using ohm's law to figure that. Thanks!
  7. J

    What do you think about these lights ?

    http://jacksontn.craigslist.org/mat/2516914230.html I am wondering how these would do in my new 30x30 shop building? Will these cost me to much to in electricity? At 400 watts running on 120 volts is over 3 amps. But they are muilti tap and 220 volts would be 1.8 amps. Just wondering if...
  8. J

    start of a new 30x30 building with prices.

    I am putting vinyl siding on. I am doing all the labor myself to keep the cost. I got a estimate on the door today. He quoted me a 12x9 roll up door with opener for $1,150.00 installed. I have a friend that is a roofing contractor that is checking on prices for me on shingles and siding I am...
  9. J

    start of a new 30x30 building with prices.

    Thanks Brent!
  10. J

    start of a new 30x30 building with prices.

    Trusses arrived Friday afternoon. I borrowed a froklift from work for a couple of weeks to get them up and the roof decking. Last pic is where I stand right now. Bought decking today and hope to install that this weekend. 50 sheets of 7/16 osb from Lowes and some more 2x4's for bracing the...
  11. J

    start of a new 30x30 building with prices.

    So here are new pics. Waiting on trusses. :beer:
  12. J

    start of a new 30x30 building with prices.

    Yea I have read a lot of threads on here asking about cost so I thought I would include them in mine. Yes I hope to have it built for around $10,000.00- $12,000. I am doing all the work myself so I think I just might slide in there. Thanks, Jamie
  13. J

    start of a new 30x30 building with prices.

    LOL...Yea that would help wouldn't.:D I live in west TN. In a town called Lexington. It is between Memphis and Nashville. Hope that helps.
  14. J

    start of a new 30x30 building with prices.

    Ok today had to spend 18.02 for a box of ramset nails. Also got the last wall up and the man door today. That brings the total spent so far at..... $5158.82 Pics tomarow because it is WAY to dark to get any. :bounce:
  15. J

    start of a new 30x30 building with prices.

    Here is what this has cost me so far. Concrete 15 yards : 1904.56 Labor : 550.00 Lumber for the walls Lowes : 903.46 Ordered trusses today 16" centers : 1783.78 Grand total so far : 5141.80 Trusses will be here next week. So progress...
  16. J

    start of a new 30x30 building with prices.

    Then here is after today.
  17. J

    start of a new 30x30 building with prices.

    Here is pics of the new pad. I has been like this for over a month and half. Life got in the way untill this past weekend.
  18. J

    start of a new 30x30 building with prices.

    I have been lurking for a while now and I have finnally been able to start my building over the holliday weekend. I am going to post what I have spent on evarything right down the the nails so other pepole can get an idea in what it cost to build. So here we go. First two is what got me...
  19. J

    a question for hvac installers

    I would figure you and a helper 8-10 hrs if all you are doing is providing the labor. Plus the cost of the crane ( I am sure he has a minimum 4hrs is standard here) and you are going to have have some material cost in that bid also. Good luck.