If referring to mine, that was one of the reasons why I left the castors on initially. With the 6” drop, I had planned on a PT frame of 2x4s, or at the least PT 1/2” plywood to take the moisture hit if I did have a spill/flood.
In the end, I decided to let the box sit on the caster bolts which...