Search results

  1. 8

    Above 1200 Sq/FT 86's 20HP shop

    So a few years ago, a local guy posted a 45kw 3 phase genset with no engine on craigslist. I bought it. It had a hercules 6 cylinder military engine on it. Kohler. I happen to have a 4 cylinder hercules that has an SAE bellhousing. With conversion to single/split phase, the derate makes it...
  2. 8

    Above 1200 Sq/FT 86's 20HP shop

    So big detour on this weekend. Due to the power issues we've been seeing, i spent the weekend updating the house subpanel to add circuits. So we are preparing for a genset, which i will get to in the shop content, as well as adding some solar to knock down my ridiculous monthly bill - 500+...
  3. 8

    Above 1200 Sq/FT 86's 20HP shop

    huge storm. 8 verified tornados in michigan
  4. 8

    Above 1200 Sq/FT 86's 20HP shop

    So we just went thru 2+ days of no power. AGAIN. It has now become a priority this summer to get a standby running. In addition to AC on the house. As far as this weekend, i'd like to get the battery wiring done on the electric namco so i can move more stuff around. Going to need clear...
  5. 8

    Above 1200 Sq/FT The Salvage Garage

    When are you just going to give up and give in to the fact that you should just start a forklift rescue business????
  6. 8

    Above 1200 Sq/FT 86's 20HP shop

    Roles and Responsibilities. They want our team to be release responsible rather than just R&D. And they're giving me no headcount. There's only so much i can do. My boss does not care about wfh at all. i can do what i want as long as i don't cause problems. He's great. I went from nuts...
  7. 8

    Above 1200 Sq/FT 86's 20HP shop

    I have been overwhelmed by life. Job is going ok, had some negative health news, and basically waiting for the weather to break so i could spend some more comfortable time outside. The company is changing our R&R and that will involve a lot of time away but i will try to minimize it. Not...
  8. 8

    Above 1200 Sq/FT 86's 20HP shop

    I heard it was a drought down there
  9. 8

    Above 1200 Sq/FT 86's 20HP shop

    It's raining in my shop. It's been raining outside for 2 days. Downpour. It's 65F today and will be down to high of 30 within a week. Mother nature is off her meds.
  10. 8

    Above 1200 Sq/FT 86's 20HP shop

    Doesn't it help on the more dry areas? SA is borderline dry right? I bought my old 86 F250 in Brownwood TX it was summer and pretty pleasant dry heat.
  11. 8

    Above 1200 Sq/FT 86's 20HP shop

    I tried once to get a job at SWRI, but it fell through. Probably good i didn't, as engine work has all but dried up. I would love the weather there though. I'm very over winter.
  12. 8

    Above 1200 Sq/FT 86's 20HP shop

    My ability to bring anything home will be extremely limited. Driving mom home. She comes down to DFW for a couple months every winter. As she likes to install X+1 m^3 of **** in X m^3 interior vehicle volume, i'll be lucky to bring a coat and not leave it hanging out the window.
  13. 8

    Above 1200 Sq/FT 86's 20HP shop

    Dfw. It's always dfw
  14. 8

    Above 1200 Sq/FT 86's 20HP shop

    I'll be in Texas Friday.. .
  15. 8

    Above 1200 Sq/FT 86's 20HP shop

    I'll keep my eyes open. M. Brane, as for 3d printing, i've got that thing running full tilt making tool holders. More on that when i'm further along.
  16. 8

    Above 1200 Sq/FT 86's 20HP shop

    I've got a filing cabinet but really don't like storing stuff like this that way. Unless there's a way to get more shelves
  17. 8

    Above 1200 Sq/FT The Salvage Garage

    Good you got it in. It's snowing here now
  18. 8

    Above 1200 Sq/FT 86's 20HP shop

    I really need to find some decent ways to store all this stuff. I can't afford Listas sadly. But that seems common.
  19. 8

    Above 1200 Sq/FT 86's 20HP shop

    Working on finishing a wheel bearing on the daily audi, and then a service on it. This weekend. I forgot i picked this stuff up a couple weeks ago. I got it all sorted finally and took a couple photos. This was 3 of about 6 tubs. I didn't get a shot of the others. There's another...
  20. 8

    Above 1200 Sq/FT The Salvage Garage

    What tooling does the Matsuura take?
Top Bottom