Thanks. I was shocked when the first bid came in at 45k. Then the second bid really brought me back to reality when it was 44.5k. I am very happy with the guy I chose. I will have the walls and floor poured, exterior walls spray foamed (below grade), and 2” styrofoam and tubing under the slab...