Hey guys,
I have a two post lift on 4" 4500PSI concrete with wire mesh in it. This was poured new well over a year ago for my garage build.
Now with more lift use time on my belt, I really would like to move my lift.
I am 2' from the edge of the pad now, I want to remain at the same spot...