97CV
Well-known member
This could get ugly.
I have two guys and a very sturdy 3x3 dolly.
Old Dominion will ship it to my Plant, I can use a fork lift to get it in to the less than ideal Uhaul Cube Van.
Then I have to get it out of that at home.
I do not have access to a Cherry Picker or any Machinery.
I have two choices.
Load it as is and deal with that at home.
Break it open and load it feet out into the van and get it out that way.
2 600# columns is not scary, I can twist and jerk 500# of material in a 55 gallon drum, so with the length of the columns as leverage, I believe I'll be ok.
How much better of an idea is feet out but loose parts vs bundled together and opposing columns for a 16 mile drive ?
I have two guys and a very sturdy 3x3 dolly.
Old Dominion will ship it to my Plant, I can use a fork lift to get it in to the less than ideal Uhaul Cube Van.
Then I have to get it out of that at home.
I do not have access to a Cherry Picker or any Machinery.
I have two choices.
Load it as is and deal with that at home.
Break it open and load it feet out into the van and get it out that way.
2 600# columns is not scary, I can twist and jerk 500# of material in a 55 gallon drum, so with the length of the columns as leverage, I believe I'll be ok.
How much better of an idea is feet out but loose parts vs bundled together and opposing columns for a 16 mile drive ?
