Ok guys, I need to see if someone can clear my head up for me. I am putting up a red iron steel build. It was bought second hand from the contractor the city had take it down, so there are no plans other than his drawings.
Now, the slab is already poured @ 8 inches thick with 2 foot x 2 foot...