  1. A

    Preparing New Slab

    I’ve read that I should wait about a month before attempting to epoxy or stain new concrete. My question is, can I go ahead and acid etch sooner or do I need to wait a month to do that too! I’m asking because the slab is about 2 weeks old now and it would sure be easier to prepare it while the...
  2. A

    Opinions on size

    I’m finishing my 1500sf building and I’m trying to figure out what to use for cooling. It’s fully insulated with 12 foot eave height and 16 feet high in the center. I’ll install a couple of ceiling fans to keep the air moving. Occasional use of the building and just need to knock down the...
  3. A

    Help with lighting layout

    Hi guys, Need opinions and help with my new build. It’s a steel garage/workshop 36 wide and 40 deep with 12 ft eave height. It will be insulated with the white backing roll in stuff on the walls and ceiling and it will all be exposed. The roof pitch is 2/12 so it will be around 15 ft high in...
  4. A

    Insulating a pole barn for a/c

    Hi All, Ready to start the building process of my 30x50x12 enclosed pole barn on a slab. Steel trusses with purlins for the roof and wooden girts for walls. I would say typical pole barn construction. All metal roof and sides located in south Alabama. I’ll definitely need more cooling than...