I'm having a slab poured next week in my new pole barn and my concrete guy says I don't need a vapor barrier. I was under the impression that it's pretty standard.
It's a 30x38 pole barn. Floor will be 6" thick. And it's sitting on 6-18" of crushed stone. About 90 tons in total.
And the...