  1. A

    3 year old Westcoat deck coating CRACKS

    I'm looking for some advice before I seek out bids to get this re-coated, I'm hoping some of the pros or vendors on here can chime in... We have a plywood based deck surrounding the second floor of our new build. A local installer did what I believe is a Westcoat ALX system on it, I have a...
  2. A

    Bendpak Car Lift auction in El Monte, CA

    For anyone in Southern California, El Monte Union High School District is selling off four Bendpak lifts as one lot on Public Surplus. Currently at $1,795 for all 4 with a little over 22 hours left. https://www.publicsurplus.com/sms/all,ca/auction/view?auc=2863422 And if someone on here is...
  3. A

    Help with ceiling boxes for lights

    We used 4" square metal boxes for a 4x4 grid of lights, but since the ceiling had to be double 5/8" drywall we put 1-1/4" mud rings so it would sit flush with the face of the drywall. I ordered 16 Bees Lighting 2-lamp T8 fixtures, expecting to hang these directly to the drywall over the 2-gang...
  4. A

    Brand new slab - when to acid etch?

    Our 1800 sq ft slab was just poured last week. I am planning on doing SPGX one part polyurea. As I understand it, I should acid wash/etch the floor before applying the polyurea, but should I do the acid wash now before they build the rest of the house? The concrete contractor suggested that I...
  5. A

    Between 705 & 1200 SQ/FT Southern CA Garage/Shop/Guesthouse Build

    We are 11 months into the permitting process with the end in sight and should be starting our build any time now. I'll save the lengthy explanation and let the pictures do the explaining for the most part. County codes really held us back, so if something looks unorthodox... that's why. 5...
  6. A

    Hello from Southern California, and our big project!

    Hello, I've been reading a ton of threads and pulling in information for a while now, but figured I should introduce myself and my project. My wife and I are about to begin building a custom home. We have been going through the design and permitting process for 11 months, and should have our...