Search results

  1. R

    Urethane left milky/cloudy finish

    I put down two coats of armorseal 1000 HS. Weather was good, overnight lows in the low 60s and humidity fine. I waited ~3 days after my second coat and put down my first coat of Rexthane and was planning to do my second coat this evening. The first coat went down clean and seemed to dry nice...
  2. R

    Garage Floor Temperatures

    I have read a lot of posts about the minimum temperatures to cure Epoxy but not able to find anything that shows for how long. I am using Armorseal HS and it has a minimum curing temperature of 50 degrees. Temperatures in Houston are hovering between a high of 65 during the days and high 40s...
Top Bottom