Our 30x30 workshop is going up as we speak. It's a metal building with R-Panels on the exterior, then 4" insulation behind the girts/purlins, followed by R-Panels 92" high on the interior of the shop.
The interior R-Panels are obviously installed on top of the girts/purlins, so I am wondering...