Search results

  1. E

    Tool for new Outbuilding foundation dig

    I just had a 40x36 post building erected. Concrete is not poured yet. I am stubbing in Conduit and other utilities. I would like to dig around the inside of the perimeter to lay 2-3" of foam board for insulation. The base layer is about 8-12 inches of VERY dense, rocky material. They had...
Top Bottom