Just getting going on 24x40 detached garage(footers and block foundation done). Installing 1/2" OB PEX for RIF heat, 2" foam. I am running 1" PEX for water(with PVC sleeve through the slab) and 3/4" yellow PE gas line (with riser pipe through the slab) that will both run through a 3"pipe in the...