That pretty much gets us caught up! The floors are stained and waiting to be sealed. After that its cabinets, finish shower, trim, toilet, and start moving some stuff in! I'll try to get some more up to date pictures posted soon!
The pictures make it look darker than it is but it is fairly dark. We were going for dark ceiling and floors with white walls. A lot of this is trial and error for when I build the cabin!
Ran everything through pex and put all of my receptacles on 20 amp circuits. It's a bit overkill but who knows what ill eventually wanna do with this room!
I framed up a wall that is easily removed to cover the second large door. I wanted it sealed up tight while I am living in here but eventually I will knock the wall out and put another set of doors in where I can roll motorcycles or whatever in and work in the air conditioning.