Thanks for the ideas Scott. I had 3 large conduits put in place before the slab and stem wall were poured so hopefully they will cover future needs. No drains so that’d have to go through a wall if I ever decide to add any sort of plumbing. As for the lift, that would be amazing but I don’t see...