First time poster. I have a 30x40x12 eversafe building coming soon. I signed my contract end of July, had to get engineered drawings then get permits, have a cement pad poured, after that it was moved to scheduling (8 to 10 weeks) now I'm about a month (or less) from install. So yes 5 month...