The Iowa DOT standard time is 7 days on the PCC they pour. As stated above, depending on the temperatures it's usually at strength in 3-5 days but without making cylinders and having them tested than 7 day waiting period is standard. In the hot part of the summer we may have a 9" roadway hit...