Been lurking for awhile gathering ideas and information. Hired a contractor this past summer to build the base building. Ground breaking took place on 7/22.
Basic plan is for a 32'x40'x12' Pole Barn structure, 3-9'x8' overhead doors with highrise, 4" cement slab (6" 6'x15' for 2 post lift), 4 floor drains (one for each bay and one for sink), 6x13 room for air compressor and storage (4.5' height in Loft above for furnace and additional storage).

View from back deck prior to ground breaking:

Advantage of having an excavator live next door:


Augering Holes: (First glitch in the build, so much natural sand caused most of the holes to collapse during this process, attempted to fill holes a few days with water, eventually required the use of sonet tubes)

Holes finally done with sonet tubes, pole footings completed:


Basic plan is for a 32'x40'x12' Pole Barn structure, 3-9'x8' overhead doors with highrise, 4" cement slab (6" 6'x15' for 2 post lift), 4 floor drains (one for each bay and one for sink), 6x13 room for air compressor and storage (4.5' height in Loft above for furnace and additional storage).

View from back deck prior to ground breaking:

Advantage of having an excavator live next door:


Augering Holes: (First glitch in the build, so much natural sand caused most of the holes to collapse during this process, attempted to fill holes a few days with water, eventually required the use of sonet tubes)

Holes finally done with sonet tubes, pole footings completed: