Here are the pictures made during the construction.4
The First set are the one of the grading
Xcel Energy took 5 weeks to move the transformer and did not move it where it was supposed to be.
Had to modify the corner of the garage to allow the cover of the transformer to open
 

Attachments

  • grading.jpg
    grading.jpg
    146.3 KB · Views: 123
  • grading back.jpg
    grading back.jpg
    50.2 KB · Views: 115
  • grading transfo.jpg
    grading transfo.jpg
    49.1 KB · Views: 117
To avoid these ads, REGISTER NOW!
OP
S

smoke90

Member
Joined
Mar 24, 2011
Messages
15
Location
Denver Co
Pre pouring

Reabr abd wire mesh.
30 cuyds of concrete without the driveway.
 

Attachments

  • wire mesh and rebar.jpg
    wire mesh and rebar.jpg
    72.2 KB · Views: 85
  • wire mesh rebar.jpg
    wire mesh rebar.jpg
    86.6 KB · Views: 80
OP
S

smoke90

Member
Joined
Mar 24, 2011
Messages
15
Location
Denver Co
here are the pictures of the framing and sheating.
I [ut only one window on the side of the house. Do not want and easy. access for the burglar.
6 Gauge wire for the 220v 50A circuit was a PITA to pass through the studs.
We alsop had to remove more of the deck.
 

Attachments

  • deck side.jpg
    deck side.jpg
    73 KB · Views: 107
  • 50A wire.jpg
    50A wire.jpg
    62.9 KB · Views: 119
  • window inside.jpg
    window inside.jpg
    58.1 KB · Views: 110
  • only window.jpg
    only window.jpg
    70.1 KB · Views: 102
OP
S

smoke90

Member
Joined
Mar 24, 2011
Messages
15
Location
Denver Co
painted last week end.
Garage door was installed yesterday.
Installed 220v and 110 V plugs, and light this week end.
Need to finish:
- The trim and soffit painting
- The floor painting
- Bench and Storage Cabinet
- Shelves for the wheels and cars parts

Hope to be done in 2 weeks.
Getting tired to work every evening and weekend on it.
Time to relax
 
Last edited:

JC23

Well-known member
Joined
Dec 31, 2009
Messages
11,718
Location
Northcoast
Looking' good and Welcome Aboard!

Hope you ain't married to that two week idea - haha.
 
To avoid these ads, REGISTER NOW!

Sr. WiNdTeCh

Well-known member
Joined
Apr 15, 2011
Messages
241
Why didn't you run your service underground in PVC?

Other than that, keep up the pictures :D
 
OP
S

smoke90

Member
Joined
Mar 24, 2011
Messages
15
Location
Denver Co
Looking' good and Welcome Aboard!

Hope you ain't married to that two week idea - haha.
I need to as after that I ll be travelling or busy till the end of July and then they will start the house extension which means all the stuff in my old garage need to be in the new one.
I have basically no choice
 
OP
S

smoke90

Member
Joined
Mar 24, 2011
Messages
15
Location
Denver Co
did the paint inside

Just need to received the base cove for the wall
paint the curve and I am done

the cabinet and 2 post lift have been ordered and should be here soon
time to organize the inside
 

Attachments

  • IMG_4009.jpg
    IMG_4009.jpg
    28.1 KB · Views: 163
  • IMG_4013.jpg
    IMG_4013.jpg
    25.5 KB · Views: 132
OP
S

smoke90

Member
Joined
Mar 24, 2011
Messages
15
Location
Denver Co
lift have been installed and tested with the chevy avalanche before having the mazda under the Evo
 