Hi,
I'm running electric to my shop. The building is around 300' from my house, maybe a little more from panel to panel.
I am in the process of having a new septic system installed which basically requires us to dig a trench from the house to within 20' of the shop. So, the plan is to bury conduit in the trench for the septic system at the same time.
I'd like to run 100A service. I haven't done load calculations, but my thought is I'd rather spend a little extra now than potentially have too much draw in the future. Future plans involve a heatpump split unit, welder, etc. so I just don't want to run into too much draw down the road if I can avoid it.
Since I need to run conduit anyways - I was considering using XHHW-2 AL 2/0 runs, instead of MHF since it's a little cheaper and more pliable and will be enclosed in conduit either way. Thinking I need (3) runs of XHHW-2 AL 2/0 for 2 hots and a neutral + (1) run of #1 AL for ground. Does that sound right?
thanks in advance
Josh
I'm running electric to my shop. The building is around 300' from my house, maybe a little more from panel to panel.
I am in the process of having a new septic system installed which basically requires us to dig a trench from the house to within 20' of the shop. So, the plan is to bury conduit in the trench for the septic system at the same time.
I'd like to run 100A service. I haven't done load calculations, but my thought is I'd rather spend a little extra now than potentially have too much draw in the future. Future plans involve a heatpump split unit, welder, etc. so I just don't want to run into too much draw down the road if I can avoid it.
Since I need to run conduit anyways - I was considering using XHHW-2 AL 2/0 runs, instead of MHF since it's a little cheaper and more pliable and will be enclosed in conduit either way. Thinking I need (3) runs of XHHW-2 AL 2/0 for 2 hots and a neutral + (1) run of #1 AL for ground. Does that sound right?
thanks in advance
Josh