bimmer1980
Well-known member
I was hooking up my #2 copper into a siemens 200amp main panel this past weekend. The #2 will be feeding a sub panel in the new garage. I was just temporarily wiring up a 50amp plug on the garage end in order to power a welder for the weekend.
My problem was that the opening on the ground bar was not large enough to accomodate the #2 copper. I ended up taking the 7 strands and putting it under 3 screws in the ground bar. 3 strands under one screw, andother 3 strands under another screw and 1 strand under the last screw. So each stand is securely attached to the ground bar. Is this an acceptable method? If not, is there a recommended method?
I did not get a chance to take a picture of it......
My problem was that the opening on the ground bar was not large enough to accomodate the #2 copper. I ended up taking the 7 strands and putting it under 3 screws in the ground bar. 3 strands under one screw, andother 3 strands under another screw and 1 strand under the last screw. So each stand is securely attached to the ground bar. Is this an acceptable method? If not, is there a recommended method?
I did not get a chance to take a picture of it......