cyamaha2007
Well-known member
Ok my meter base is set up for 2 panels but i dont know if i should use a double mechanical aluminum lug or go under the stud thats holding the extra wing. The electrical company is no help. They said tie into it we dont care what you do. Heres a pic im thinking of, i want to tie in the new run to the stud just above the old run. Im talking about the load side or bottom of the meter base. The double mechanical aluminum lugs i bought are bulky and would kinda be in the way. This is a no inspection situation in case it maters.
http://i237.photobucket.com/albums/ff250/cyamaha2007/Mobile%20Uploads/IMG_9314.jpg[/IMG
Thanks for your help again guys
http://i237.photobucket.com/albums/ff250/cyamaha2007/Mobile%20Uploads/IMG_9314.jpg[/IMG
Thanks for your help again guys