Looking for some suggestions on where to place a 2 post lift with the layout below. I'd love to have the door centered but with easements and where the driveway sits it has to be done like this. Getting ready to pour the slab in the next few weeks and want to have it poured thicker where the 2 post lift will eventually go. Thanks in advance for any help.
