I have a 40x60 shop on which one end I want to put a mezzanine up in. I would like the underneth to be as open as possible. That being said, I am setting this up on one end of the shop so the wall will be one side of mezzanine. Post on the wall side have a 8x8 on each corner and 2 ea. 8x8 14' and 12' (making up the 40' length. The other end of the mezzanine will be the open shop area. I plan on putting up 2 ea. 6x6 post set at the same distance as the 14' and 12' post on the wall side. I am planning on running 2x12 as joist the entire 20' span. I have been told I would have to use some rather heavy sawn lumber of 8x10 or maybe 10x12. My question, I was hoping to use 3 or 4 ea. 2x12 sandwiched with 1/2 plywood in between. Fastened together with glue, and 3/8 bolts.
Am I on the right track here?
Am I on the right track here?