Hey guys, so I've learned a lot and done a TON of research over the last couple years for this but I want to run this by the journal.
A short recap:
I have a maxjax in the garage 6 joists on the 8 ft top plate going across the garage. I moved one of them to give me more clearance for the lift but I need more room for trucks and I also need a ceiling for when I AC the space.
So, the space from wall to wall is 21.5x22.5. The ceiling joists/rafter ties used are garbage, cut too short and so they're effectively 2x4's spanning 21.5 ft. not good.
My solution is to replace all of those joists with 2x8's cut to the right angle and length on 16" centers for my 5/8 sheetrock/blown insulated ceiling.
I'm pretty sure that's kosher.
The thing I'm unsure about is for the sectioned area above the lift. I want a 8 ft wide 15" rise spanning the length of the garage down the middle.
Option 1: stack a 2x8 rafter tie on top of the ceiling joists each side of the lift cutout area then use 2x4's with 16" centers going all the way back
Option 2: 2x8's going across as rafter ties above the lift cutout and use 1x3's to screw my sheetrock/tie the rafter ties laterally together?
Option 3: same as option 1 but use 2x10's on top of the ceiling joists.
Also, in the meantime would it be okay to section that strongback to give me the clearance I need or should I only section it if I'm going to actually somehow tie each side together?
A short recap:
I have a maxjax in the garage 6 joists on the 8 ft top plate going across the garage. I moved one of them to give me more clearance for the lift but I need more room for trucks and I also need a ceiling for when I AC the space.
So, the space from wall to wall is 21.5x22.5. The ceiling joists/rafter ties used are garbage, cut too short and so they're effectively 2x4's spanning 21.5 ft. not good.
My solution is to replace all of those joists with 2x8's cut to the right angle and length on 16" centers for my 5/8 sheetrock/blown insulated ceiling.
I'm pretty sure that's kosher.
The thing I'm unsure about is for the sectioned area above the lift. I want a 8 ft wide 15" rise spanning the length of the garage down the middle.
Option 1: stack a 2x8 rafter tie on top of the ceiling joists each side of the lift cutout area then use 2x4's with 16" centers going all the way back
Option 2: 2x8's going across as rafter ties above the lift cutout and use 1x3's to screw my sheetrock/tie the rafter ties laterally together?
Option 3: same as option 1 but use 2x10's on top of the ceiling joists.
Also, in the meantime would it be okay to section that strongback to give me the clearance I need or should I only section it if I'm going to actually somehow tie each side together?