Before I close up the final wall on my garage I need to run 240 through the wall down to the utility room.
I freely admit I don't know **** about electrons over 12 VDC so the actual connections and finish work will be done by someone else...but I can at least pull the wire through the ceiling/wall while i'm here before insulation.
So:
~150ft run max (probabably 120ft but rather over shoot)
Welder is rated at 230/1/60 (hope that means more to you than me)
x/2? Any reason to add x/3?
Solve for x.