25x50 Garage to Tinker

OP
M

Mighunter

Well-known member
Joined
Oct 16, 2018
Messages
85
Location
Rhode Island
Ready for concrete. My rebar skills need alot of work but I think it will work.
 

Attachments

  • 20190728_175006.jpg
    20190728_175006.jpg
    112.6 KB · Views: 130
  • 20190728_175021.jpg
    20190728_175021.jpg
    143.7 KB · Views: 149
  • 20190728_175014.jpg
    20190728_175014.jpg
    121 KB · Views: 124
To avoid these ads, REGISTER NOW!
OP
M

Mighunter

Well-known member
Joined
Oct 16, 2018
Messages
85
Location
Rhode Island
Well got that done :)
 

Attachments

  • 20190731_103821.jpg
    20190731_103821.jpg
    83.8 KB · Views: 118
  • 20190731_102316.jpg
    20190731_102316.jpg
    94 KB · Views: 120
  • 20190731_101330.jpg
    20190731_101330.jpg
    147.9 KB · Views: 109
  • 20190731_101247.jpg
    20190731_101247.jpg
    88.5 KB · Views: 108
  • 20190731_101231.jpg
    20190731_101231.jpg
    146.8 KB · Views: 119
OP
M

Mighunter

Well-known member
Joined
Oct 16, 2018
Messages
85
Location
Rhode Island
Started on painting the lower section grey
I want to do a red stripe too but weighing if it would be worth the effort. Also painted the inside of the exit door red to go with the color scheme of red, black and grey I got going on
 

Attachments

  • 20190803_105503.jpg
    20190803_105503.jpg
    60.5 KB · Views: 90
  • 20190803_105449.jpg
    20190803_105449.jpg
    107.3 KB · Views: 92
  • 20190803_105442.jpg
    20190803_105442.jpg
    102.5 KB · Views: 92
  • 20190802_141408.jpg
    20190802_141408.jpg
    109.2 KB · Views: 96
OP
M

Mighunter

Well-known member
Joined
Oct 16, 2018
Messages
85
Location
Rhode Island
Picked up a couple cheap plastic paper towel dispensers. Of course I couldn't just leave them alone, had to customize them.....
 

Attachments

  • 20190804_110910.jpg
    20190804_110910.jpg
    67.1 KB · Views: 64
  • 20190804_110857.jpg
    20190804_110857.jpg
    93.6 KB · Views: 70
OP
M

Mighunter

Well-known member
Joined
Oct 16, 2018
Messages
85
Location
Rhode Island
So I decided to do the red stripe and i'm glad I did. Painted the bathroom door red as well. Gotta touch up a few spots and i'll be done painting.

Got to let the newly poured concrete pads cure another 2 weeks and then I can FINALLY get the lift installed and I can move onto the floor and clean up my mess! :rocker::rocker::rocker:
 

Attachments

  • wall5.jpg
    wall5.jpg
    150.2 KB · Views: 91
  • walll4.jpg
    walll4.jpg
    123.4 KB · Views: 68
  • wall3.jpg
    wall3.jpg
    108.3 KB · Views: 75
  • wall2.jpg
    wall2.jpg
    102.8 KB · Views: 71
  • wall1.jpg
    wall1.jpg
    98 KB · Views: 72

DynoDave

Well-known member
Joined
Mar 25, 2005
Messages
1,685
Location
Michigan
So I decided to do the red stripe and i'm glad I did.

48475489266_5c86715522_o.png
 
OP
M

Mighunter

Well-known member
Joined
Oct 16, 2018
Messages
85
Location
Rhode Island
Well maybe after almost 2 months after trying to install this lift and finding out the concrete wasn't thick enough, it was finally installed today without any issues. Now just to get electricity to it so I can actually use it!!!

Now I can also start putting down the race deck flooring. I think i'm going to try and start on that this weekend :beer:
 

Attachments

  • Lift3.jpg
    Lift3.jpg
    147.4 KB · Views: 117
  • lift4.jpg
    lift4.jpg
    120.5 KB · Views: 95
  • lift5.jpg
    lift5.jpg
    77.6 KB · Views: 92
OP
M

Mighunter

Well-known member
Joined
Oct 16, 2018
Messages
85
Location
Rhode Island
Thanks bud, already wish I had more space lol. After the floor is in, I have start thinking about how i'm going to do this mezzanine. I know steel would probably be best especially since I don't want a column in the middle, but I have to see if I can do it in wood if I can use an LVL and not have a column to support the middle going width wise. Hmmmmm
 
To avoid these ads, REGISTER NOW!

GLTHFJ60

Well-known member
Joined
Oct 31, 2013
Messages
821
Location
Durham, NC
Where do you plan on putting the mezzanine? Against the back wall?

You should be able to get a LVL that will span 22', but it'll be big. Steel is preferred I would think.
 

Deezler

Well-known member
Joined
Nov 1, 2011
Messages
240
Location
Southeast MI
The LVL might not need to traverse the full span (width) though. You'll have stairs going up one side, right? Boom, there can be a post right there at 3 or 4 feet in from the wall. And if you have work benches or anything like that on the other side under the mezz, you could have another post at 2 or 3 feet also. So now you're under 20 ft of LVL span. Should be easy to do.
 
OP
M

Mighunter

Well-known member
Joined
Oct 16, 2018
Messages
85
Location
Rhode Island
Yeah my plan was to have the mezzanine span the width of the room along the back wall and come out maybe 15 feet. The one think I really don't want is a long set of stairs extending out into the rest of the shop, it would eat up too much room.

So my thought was to have the stairs run parallel to the front of the mezzanine or have them under one side of the mezzanine if that makes sense.
 
OP
M

Mighunter

Well-known member
Joined
Oct 16, 2018
Messages
85
Location
Rhode Island
Made some progress today. Got the lift powered up and working. Have to try a car soon but so far it works. Put some Racedeck flooring down too. I got the Tuffshield and it is shiny and its probably going to be tough to keep clean but so far so good. Hope to get the floor done in the next couple weeks...hard to find the time lately :(
 

Attachments

  • 20190824_182039.jpg
    20190824_182039.jpg
    150.4 KB · Views: 40
  • 20190824_181746.jpg
    20190824_181746.jpg
    151.5 KB · Views: 49

lakeroadster

Well-known member
Joined
Jan 19, 2015
Messages
5,166
Location
Central Colorado
So now I have to cut out two pads under the columns and pour thicker concrete.

Curious as to who told you to cut two pads? That's scary as hell for a 2 post lift.

Most retrofits for a 2 post lift specify cutting out the existing slab all the way across and utilize rebar in the new slab... as shown below. Notice also they call for 12" of concrete thickness.
 

Attachments

  • Mohawk Lift Slab Retrofit 001.jpg
    Mohawk Lift Slab Retrofit 001.jpg
    37.3 KB · Views: 50
  • 2 post lift.jpg
    2 post lift.jpg
    131.4 KB · Views: 50
Last edited:
OP
M

Mighunter

Well-known member
Joined
Oct 16, 2018
Messages
85
Location
Rhode Island
The company that installed it told me to cut two 4’x4’ pads out...they marked them out. My lift only required 4.25” thick concrete believe it or not. Idk if it’s because I have the crossmember on top rather than along the bottom but I went down 12-14 inches as well as dug under the existing slab as well as rebar. I think the crossmember on top definitely helps with helping the tops wanting to tip towards each other. But to be honest, I don’t think cutting the pad all the way across is necessary. Would it hurt? No but if the concrete is thick enough AND u dig out under the existing slab I think that’s more than enough IMO
 
OP
M

Mighunter

Well-known member
Joined
Oct 16, 2018
Messages
85
Location
Rhode Island
And the cutaway u show doesn’t not show the deeper slab going underneath the thinner slab. It shows the rebar going into the existing slab and sticking out into the deeper section which is what I did.
 
OP
M

Mighunter

Well-known member
Joined
Oct 16, 2018
Messages
85
Location
Rhode Island
Last thing, the new pads were poured with 4000 psi concrete. I wanted to do 5000 but I couldn’t get that in a small batch from the truck
 
OP
M

Mighunter

Well-known member
Joined
Oct 16, 2018
Messages
85
Location
Rhode Island
Spent most of the day today trying to get the floor done. I still have some pieces to cut in around the bathroom door jam, toilet and some other spots in the bathroom. I also have to cut some black tiles along one of the long walls and a few small pieces around on of the lift posts and take apart the mop sink so I can put tiles under the four legs.

Going to pick up some 6 inch black vinyl baseboard molding this week and see if I can get it all done in the next week or two.
 

Attachments

  • 20190901_162436.jpg
    20190901_162436.jpg
    101 KB · Views: 56
  • 20190901_162502.jpg
    20190901_162502.jpg
    148 KB · Views: 55