Wow... can't believe it's been 4 months since I last updated!
Tremendous amount of work done since last update... With the help of my brother in law and a good friend, we worked our asses off from early December to late Feb... Then I continued on my own.
In fact, 1st floor of the garage is 90% completed. What's left is a couple moldings to install, door frames who needs to be painted and some finishing touches like a ceiling light and sink to install... Should be able to take care of all that within a day or two. The main thing left to do on the first floor will be the ceramic tiles. But I may give that to a local contractor... We'll see. Lots of work done on the second floor too. Wiring, plumbing and divisions are completed. It's ready for Gyprock. I plan on hiring a couple guys over the summer to install it, and probably give the plaster to a local contractor...
Unfortunately, I didn't take too many picture of the process, but I'll post what I have over the next couple days.
I'll update the thread later with better pictures of the interior. I'm very happy with the way it came out so far.
More to come