Hey guys,
Found this forum looking for ideas around my new construction shop project.
Been in the works for the last 2 years, we moved from our first home with the intention of finding a new home with a large garage shop. No luck with that after months of searching. So we bought a place we loved with room to build and set to work.
After several bids and quotes I decided to work with Permabilt to put in my shop. They took care of the permitting which was worthwhile for sure in my county.
Will post pictures of the build and how it evolved. 28x48x12 carport end with 2 11’ insulated overhead doors.
First steps were to remove a large pond and water feature the previous owner put in and relocate the play set from one side of the yard to the other.
The I needed to make room for drive way and access by limbing my trees up 20’ and removing the blackberry bushes and old debris from the drive way site.
Here’s our back yard after a bit of tree trimming.

Started by removing and relocating the sod from the lawn.

After that ordered in 60 yds of crushed rock


Spread but needed more to level.

Sent from my iPhone using Tapatalk
Found this forum looking for ideas around my new construction shop project.
Been in the works for the last 2 years, we moved from our first home with the intention of finding a new home with a large garage shop. No luck with that after months of searching. So we bought a place we loved with room to build and set to work.
After several bids and quotes I decided to work with Permabilt to put in my shop. They took care of the permitting which was worthwhile for sure in my county.
Will post pictures of the build and how it evolved. 28x48x12 carport end with 2 11’ insulated overhead doors.
First steps were to remove a large pond and water feature the previous owner put in and relocate the play set from one side of the yard to the other.
The I needed to make room for drive way and access by limbing my trees up 20’ and removing the blackberry bushes and old debris from the drive way site.
Here’s our back yard after a bit of tree trimming.

Started by removing and relocating the sod from the lawn.

After that ordered in 60 yds of crushed rock


Spread but needed more to level.

Sent from my iPhone using Tapatalk