I'm almost ready for a rough-in inspection. I added a 2nd main panel to feed a attached garage sub panel for 6 new circuits in the garage (lights, fans, lift, air compressor, 2 receptacle circuits).The first 200A main panel is full physically and fully loaded. So, to get enough current to run the garage I needed to install a 2nd main panel.
I've read that I can just add a saddle clamp onto the first panel's ground rod for the 2nd main panel, but I dug down 18" and still haven't found the rod or water pipe.. and I've hit the concrete that's holding the meter base.
My question is this: Can I attach the 2nd main panel's ground to the ground wire of the 1st main panel? Or does it have to attach to the ground rod?
Lots of info from this site helped me do this, thanks!!
I've read that I can just add a saddle clamp onto the first panel's ground rod for the 2nd main panel, but I dug down 18" and still haven't found the rod or water pipe.. and I've hit the concrete that's holding the meter base.
My question is this: Can I attach the 2nd main panel's ground to the ground wire of the 1st main panel? Or does it have to attach to the ground rod?