ForceFed70
Well-known member
I finally have my building permit!
$1100 in surveying
$600 in permit fees (more to come).
And I still had to fight like crazy to get the permit.
They wanted a professionally completed site plan showing topology and all grading changes...My building site is almost flat! But since I am building within 45' of a slope apparently you need to obtain a "development permit". Then he started talking about wildfire mitigation plan.. I live in a residential area! Finally talked to a different guy who was willing to use a more common sense approach and approve the permit.
Frustrating but it's finally over with. Gotta get one of my foundation walls engineered tho
Kinda scary that I've spent all this effort and $$$ but haven't even started to build anything yet! Anyone else have problems getting their permit when it should have been straight forward?
$1100 in surveying
$600 in permit fees (more to come).
And I still had to fight like crazy to get the permit.
They wanted a professionally completed site plan showing topology and all grading changes...My building site is almost flat! But since I am building within 45' of a slope apparently you need to obtain a "development permit". Then he started talking about wildfire mitigation plan.. I live in a residential area! Finally talked to a different guy who was willing to use a more common sense approach and approve the permit.
Frustrating but it's finally over with. Gotta get one of my foundation walls engineered tho
Kinda scary that I've spent all this effort and $$$ but haven't even started to build anything yet! Anyone else have problems getting their permit when it should have been straight forward?


Wasn't a damn thing the piece of trash could do about it