I built my pole barn before the house so that I would have a shop to work out of. That was about 20 years ago. Time moves on.
When I built the shop I bought a Siemens 125 amp Load Center. Screwed it to the wall and even bought the 4 gage wire to run from the main panel to the sub for a 60 amp sub panel. It was intended to be a place to wire in a 50 amp for my welder, and a couple other recepticals for whatever came along. The sub is across the shop near the OHD so that if needed I can plug in a welder and work outside or the far side of the shop.
So one thing leads to another and time flies. Now I am finally at a point where I want to actually run some non metallic tubing from the main to the sub. So the reason for the post is based on the time the project actually began and the materials purchased and installed then, and what is needed now.
My load center is dated 1998, was screwed to the wall at the time. But never wired. It only has 3 lugs for line in. Two hot, and a ground / neutral. The ground / neutral is isolated from the box.
So as I understand, a sub panel now needs a 4 wire in. Two hots, ground and neutral. No bond between the ground and neutral until the main panel. I plan to wire a 50 amp receptical for my welder, and like mentioned a couple other recepticals. Maybe 240v for future use and a couple 120v recepticals. My welder has a 50 amp 3 wire plug and the 120v recepticals would only use 3 wires. So do I need to replace the load center with a new one that has a 4 wire in? Or can I simply use the one that is already installed? I know that the existing box will work, but am I limiting myself by using it or should I just start over. After all I been on this for a while already.
Or can I simply buy a lug bar and screw it to the box and use it as the ground?
When I built the shop I bought a Siemens 125 amp Load Center. Screwed it to the wall and even bought the 4 gage wire to run from the main panel to the sub for a 60 amp sub panel. It was intended to be a place to wire in a 50 amp for my welder, and a couple other recepticals for whatever came along. The sub is across the shop near the OHD so that if needed I can plug in a welder and work outside or the far side of the shop.
So one thing leads to another and time flies. Now I am finally at a point where I want to actually run some non metallic tubing from the main to the sub. So the reason for the post is based on the time the project actually began and the materials purchased and installed then, and what is needed now.
My load center is dated 1998, was screwed to the wall at the time. But never wired. It only has 3 lugs for line in. Two hot, and a ground / neutral. The ground / neutral is isolated from the box.
So as I understand, a sub panel now needs a 4 wire in. Two hots, ground and neutral. No bond between the ground and neutral until the main panel. I plan to wire a 50 amp receptical for my welder, and like mentioned a couple other recepticals. Maybe 240v for future use and a couple 120v recepticals. My welder has a 50 amp 3 wire plug and the 120v recepticals would only use 3 wires. So do I need to replace the load center with a new one that has a 4 wire in? Or can I simply use the one that is already installed? I know that the existing box will work, but am I limiting myself by using it or should I just start over. After all I been on this for a while already.
Or can I simply buy a lug bar and screw it to the box and use it as the ground?