30x40 man barn build

bileshake

Active member
Joined
Oct 20, 2009
Messages
30
Location
Ontario Canada
Started this Jan2 of this year, building it as we're building our house. Our electrician talked us into running our service to the shop first (shop is closer to the road...) then wire it for a NG generator backup so all the mess and noise is off the shop and hidden from the house.
 
To avoid these ads, REGISTER NOW!
OP
B

bileshake

Active member
Joined
Oct 20, 2009
Messages
30
Location
Ontario Canada
this will get it started, foundation forms and backfill.
 

Attachments

  • IMG_0082.jpg
    IMG_0082.jpg
    132.9 KB · Views: 42
  • IMG_0509.jpg
    IMG_0509.jpg
    92.2 KB · Views: 51
OP
B

bileshake

Active member
Joined
Oct 20, 2009
Messages
30
Location
Ontario Canada
Here's the plans used...
 

Attachments

  • Milton shop cross.jpg
    Milton shop cross.jpg
    112.2 KB · Views: 86
  • milton shop elevations.jpg
    milton shop elevations.jpg
    119.3 KB · Views: 86
  • Milton shop foundation.jpg
    Milton shop foundation.jpg
    120.8 KB · Views: 100
OP
B

bileshake

Active member
Joined
Oct 20, 2009
Messages
30
Location
Ontario Canada
Day one of framing actually seen the walls up and two walls sheeted. Sorry, framing started Jan.2 2012, there was obviously quite a bit of prep and excavation done prior.
 

Attachments

  • IMG_0542.jpg
    IMG_0542.jpg
    125.2 KB · Views: 30
  • IMG_0538.jpg
    IMG_0538.jpg
    123.9 KB · Views: 28
OP
B

bileshake

Active member
Joined
Oct 20, 2009
Messages
30
Location
Ontario Canada
Day two of framing walls are sheathed and trusses start.
 

Attachments

  • IMG_0545.jpg
    IMG_0545.jpg
    105.5 KB · Views: 37
  • IMG_0546.jpg
    IMG_0546.jpg
    114.8 KB · Views: 35
  • IMG_0547.jpg
    IMG_0547.jpg
    109.3 KB · Views: 51
To avoid these ads, REGISTER NOW!
OP
B

bileshake

Active member
Joined
Oct 20, 2009
Messages
30
Location
Ontario Canada
Now, Roof is on and wrapping started but concrete guys were hot to get the floor poured. Perfect, they were pouring the house basement and attatched garage so keep em going! Get this mess outta the way in one shot.
Framer took a break to let the smoke clear and they're come back next week to rough in the bay doors and finish the typar.
 

Attachments

  • IMG_0569.jpg
    IMG_0569.jpg
    97.5 KB · Views: 44
  • IMG_0570.jpg
    IMG_0570.jpg
    68.9 KB · Views: 52
OP
B

bileshake

Active member
Joined
Oct 20, 2009
Messages
30
Location
Ontario Canada
Thanks guys, I'll post more pics when the mess is cleaned up. We just finally got Jan. weather so I've gotta go get the extra wood cleaned up and in the shop so it reusable.

The shop is for hot rod work and band practice when it's done.
 
OP
B

bileshake

Active member
Joined
Oct 20, 2009
Messages
30
Location
Ontario Canada
I'm trying to sort out a radiant tube heating system that doesn't run directly over the hoist area.
 

Attachments

  • Milton shop heating.jpg
    Milton shop heating.jpg
    134.1 KB · Views: 81