quakerj
Well-known member
I've been planning a 30x50 garage/shop build, have everything lined up and am breaking ground tomorrow. 2-post lift is ordered and should be delivered next week. Pre-engineered steel building kit (from Mueller in LA) is going to be picked up May 2nd. Concrete contractor lined up for mid-April.
Rented a 100hp track loader (Bobcat) for the site prep, already have some 54 tons of crushed stone on the ground for slab base. Found a fellow on FB Marketplace that was renting out the Bobcat; that saved me almost $1,000 compared with what the rental companies were charging. I did have to rent a toothed bucket for the weekend though, probably $79 well spent. That's this weekend's project is to get site prep complete and then the aggregate laid down. Then my 14 year old son can get started with the plate compactor, compacting the stone (good job for him). Still have to get footers figured out, whether I do them myself or hire it out.
Glad I pulled the trigger when I did (couple months back); costs are going up like crazy, though I'm going to eat it on a few things that I haven't purchased yet (rebar, wire mesh, vapor barrier, few other odds and ends). I'll update this thread as the work progresses. Here's some before pics I took this evening before we get to digging tomorrow. And one back when the rock was delivered.
The Bobcat for site prep had to be scheduled 3 weeks in advance, so I was taking a huge chance on weather and basically just picking a weekend on the calendar. Thankfully no rain, but will be much colder (and windier) than I'd hoped-- 46 degree high tomorrow, and 50 degrees on Sunday. Guess I'll have to tough it out.





Rented a 100hp track loader (Bobcat) for the site prep, already have some 54 tons of crushed stone on the ground for slab base. Found a fellow on FB Marketplace that was renting out the Bobcat; that saved me almost $1,000 compared with what the rental companies were charging. I did have to rent a toothed bucket for the weekend though, probably $79 well spent. That's this weekend's project is to get site prep complete and then the aggregate laid down. Then my 14 year old son can get started with the plate compactor, compacting the stone (good job for him). Still have to get footers figured out, whether I do them myself or hire it out.
Glad I pulled the trigger when I did (couple months back); costs are going up like crazy, though I'm going to eat it on a few things that I haven't purchased yet (rebar, wire mesh, vapor barrier, few other odds and ends). I'll update this thread as the work progresses. Here's some before pics I took this evening before we get to digging tomorrow. And one back when the rock was delivered.
The Bobcat for site prep had to be scheduled 3 weeks in advance, so I was taking a huge chance on weather and basically just picking a weekend on the calendar. Thankfully no rain, but will be much colder (and windier) than I'd hoped-- 46 degree high tomorrow, and 50 degrees on Sunday. Guess I'll have to tough it out.