To avoid these ads, REGISTER NOW!

30x55 Garage Condo

OP
E

ewjax

Well-known member
Joined
Mar 6, 2015
Messages
72
So I've been busy. Put up the High bay Nuvo led lights, big *** fan, and lift.

Also built the storage room today.

Next week, the PEI 5 tile goes in, then going to wire the storage room, setup my 24" vanity. And then sheetrock the back room.

Going with sandless 1/16" grout and back buttering all the tiles.20180521_175527.jpg20180516_192420.jpg20180521_185234.jpeg20180526_163946.jpeg20180526_120605.jpg
 
To avoid these ads, REGISTER NOW!
OP
E

ewjax

Well-known member
Joined
Mar 6, 2015
Messages
72
Tile is going in.

Leveling and underlayment first. They are laying in tile day. All the tile is being back-buttered.

1/16 sandless grout

20180529_182809.jpeg20180529_182928.jpg20180529_182857.jpg20180530_181541.jpeg
 
To avoid these ads, REGISTER NOW!
OP
E

ewjax

Well-known member
Joined
Mar 6, 2015
Messages
72
I've been busy. Place is 98% complete. Need a fridge and some stain on the ceiling in the storage area.

Barn door is from home depot...

Stuck a wash basin in storage are as well.IMG_20180617_195248_710.jpeg20180608_192337.jpeg20180618_002329.jpeg
 
OP
E

ewjax

Well-known member
Joined
Mar 6, 2015
Messages
72
Yes. Completely sold out... Everything is all set in my unit....70403fa7ee322486e3f38d8802f65771.jpg
 

Attachments

  • 70403fa7ee322486e3f38d8802f65771.jpg
    70403fa7ee322486e3f38d8802f65771.jpg
    28.8 KB · Views: 8

Greg_STL

Well-known member
Joined
Mar 12, 2015
Messages
675
Wow. Looks really nice! Do you have a picture of what is up on the mezzanine?

PS: Nice cars!
 
To avoid these ads, REGISTER NOW!
Top Bottom