Here is my 32x40x10 stick built garage project that I have been working on since June of this year. We decided it was time to build a dedicated shop/hangout garage. My 3rd stall shop just didn't' have the room over the years to do a lot of work in, especially after adding tools and a tractor over the years. I would have to move everything in and out just to do really anything in it. I will be doing the majority of work on this to keep it affordable.
The Plan
32X40x10
2x6 walls
16x8 and 9x8 garage doors
In floor heat
200amp service
Here is the location I've selected, now to remove the garden. Back left corner of our 2.75 acre property. You might be able to see the stakes to see the layout.

Roughing out the layout with my 1025R in late May of this year, spent about 10 hours moving dirt, piling it in back for later use in the front.

Material delivery late may. I had ordered it all in March, hoping to save on rising prices and avoid delays for doors and materials.

Working on the pad in preparation for concrete for the last week in June.

Still need more


180 Tons Later !!!! about about 2-3 days total

Concrete guys got the forms and insulation in, time for me to install the 4 300' runs of pex


The Plan
32X40x10
2x6 walls
16x8 and 9x8 garage doors
In floor heat
200amp service
Here is the location I've selected, now to remove the garden. Back left corner of our 2.75 acre property. You might be able to see the stakes to see the layout.

Roughing out the layout with my 1025R in late May of this year, spent about 10 hours moving dirt, piling it in back for later use in the front.

Material delivery late may. I had ordered it all in March, hoping to save on rising prices and avoid delays for doors and materials.

Working on the pad in preparation for concrete for the last week in June.

Still need more


180 Tons Later !!!! about about 2-3 days total

Concrete guys got the forms and insulation in, time for me to install the 4 300' runs of pex