PsRumors
Well-known member
We bought the house 10 years ago with the 32x40 shop already in place. Due to other needs it has just been used quite a bit for various duties but I haven't been able to devote much time to getting it set up the way I want it. That is starting to change.
The shop area is 32x32. When looking at the front into the building there is a office and 8 foot wide hall on the left. The hall contains storage shelves, a deep freeze and a refridgerator, all that will stay.
So I have the 32x32 to work with. I will be doing a ceiling shortly and blown in insulation, mainly so I can heat the place when it gets cold, I don't mind sweating but A/C will come at a much later date. I have thought about removing that long *** workbench completely or half of it and putting in a 4x8 welding table along the wall, maybe sticking out length wise.
Thoughts? What would you all do?
The shop area is 32x32. When looking at the front into the building there is a office and 8 foot wide hall on the left. The hall contains storage shelves, a deep freeze and a refridgerator, all that will stay.
So I have the 32x32 to work with. I will be doing a ceiling shortly and blown in insulation, mainly so I can heat the place when it gets cold, I don't mind sweating but A/C will come at a much later date. I have thought about removing that long *** workbench completely or half of it and putting in a 4x8 welding table along the wall, maybe sticking out length wise.
Thoughts? What would you all do?
