36 x 24 for Christmas in SC

regularguysc

Member
Joined
Sep 7, 2012
Messages
20
Location
Hartsville SC
Hello All,

The build started in Oct. for my 36 x 24 x 12 with attic trusses then sort or stalled with weather and getting the concrete poured. The last two weeks have been hectic with workmen, and I think they are working towards getting finished and their final payment before Christmas.

Concrete foundation and slab went in. Wall framing and was up last week and the attic trusses put in place. Roofing happened this weekend and the interior stairs and windows should go in today. 3 windows on one side and 2 on the other side (2 x 4 windows, landscape, 7 feet high for security) with 2 front and 1 side window in the attic. They may get to siding, then the doors (9 x 10) should appear tomorrow. No electric or water planned yet. I need to get the building complete and inspected, then electrical and water happen in the new year. This is a budget build, no insulation or other fancy niceties until later. I did pop for a polished concrete floor (6 inch for a future lift), which will still need to happen.
 

Attachments

  • P1130545.JPG
    P1130545.JPG
    81.1 KB · Views: 78
  • P1130598.JPG
    P1130598.JPG
    79 KB · Views: 75
  • P1130637.JPG
    P1130637.JPG
    87.3 KB · Views: 82
To avoid these ads, REGISTER NOW!
To avoid these ads, REGISTER NOW!

500knots

New member
Joined
Dec 31, 2012
Messages
4
Location
Mempis Area
Looks GREAT regularguysc! Question ... what constituted having a "polish-able" concrete floor? Is it a certain PSI etc? I want to have polished / stained floors as well, with a future lift, but dont know what is required.
 

Cobra6

Well-known member
Joined
Oct 23, 2007
Messages
1,380
Location
Tennessee
electrical and water would be easier if planned them before you poured the concrete.

I'm guessing you didn't rough in anything since you didn't get a plumbing inspection?
PEX may be your best friend.
 