I am wanting to build a shop in the spring and I am up in the air as far as which way I want to build it. I want 12' ceilings. What would be a better option going the pole built method or use 2 x 6 wall framing? I will finsih the inside and I think it would be cheaper to stick build since you would still have to frame it out to finish the inside on a post frame building. Just curious on maybe some real life experience.
Thanks