I'm new to the forum. I figured I would do a thread on my build as it happens. So far, only the site prep is started.
 

Attachments

  • 20140424_104428.jpg
    20140424_104428.jpg
    54 KB · Views: 85
  • 20140425_121913.jpg
    20140425_121913.jpg
    40.2 KB · Views: 92
To avoid these ads, REGISTER NOW!

ADSR

Well-known member
Joined
Jan 12, 2013
Messages
10,713
Welcome to the board.

Congrats on the ground breaking!
 
OP
S

seymer

Member
Joined
Apr 27, 2014
Messages
17
Its been raining here in southern michigan for the last 5-6 days. So no more progress to report.

Heres a few more details on my barn
36*56*12, 4/12, pitch, storage space trusses, wainscotting, 1 ft overhangs on all sides boxed in soffits, 2 10*12 insulated overhead doors one on each gable end, 1 36 inch man door, 2 double pane windows, 4 inch concrete with mesh. 1 floor drain in middle of shop.

I believe I'm getting a screaming deal. Amish crew to build and contract is signed for 22,076. I have do do my own site prep and pull my permits. I should be able to do the whole thing for just over 24,000. I was curious what others have paid in the past for a similar build?
 

Dragfluid

ALLIANCE MEMBER
Joined
Sep 15, 2013
Messages
17,500
Location
Pillager, MN
Sounds good. Welcome!
Just got a good start on my own. It's exciting!

Keep the pics coming when they're happening.
 
OP
S

seymer

Member
Joined
Apr 27, 2014
Messages
17
Hopefully site prep will be done by noon.
 

Attachments

  • 20140430_084112.jpg
    20140430_084112.jpg
    48.6 KB · Views: 137
  • 20140430_090645.jpg
    20140430_090645.jpg
    43.2 KB · Views: 96
  • 20140430_094529.jpg
    20140430_094529.jpg
    43.1 KB · Views: 92
OP
S

seymer

Member
Joined
Apr 27, 2014
Messages
17
Site prep is finished, just need to rent a plate compactor. Construction should start middle of next week.
 

Attachments

  • 20140501_094531.jpg
    20140501_094531.jpg
    45.9 KB · Views: 66

hysinthius

Active member
Joined
May 3, 2012
Messages
44
ill be watching. looking to kick mine off in the next month with similar dimensions. was planning 36x40 but pending quote might extend it to 52.

J
 
OP
S

seymer

Member
Joined
Apr 27, 2014
Messages
17
Yeah, ill keep the board updated with pics and problems I run into
 
OP
S

seymer

Member
Joined
Apr 27, 2014
Messages
17
That seems awfully cheap with the doors and concrete included! Wish I had got out that cheap!

Yeah, thats what I thought. Ill post full invoice and pics if you guys are interested. The next cheapest quote I got was for 21000 without concrete. Guy said add 2.95 square foot for howevermuch concrete I wanted.
 
OP
S

seymer

Member
Joined
Apr 27, 2014
Messages
17
Construction was delayed this week. Hope to start Monday weather permitting.
 
To avoid these ads, REGISTER NOW!
OP
S

seymer

Member
Joined
Apr 27, 2014
Messages
17
Bright and early this morning, on about a hour and 15 minutes into the job
 

Attachments

  • 20140512_073926.jpg
    20140512_073926.jpg
    56.9 KB · Views: 110
OP
S

seymer

Member
Joined
Apr 27, 2014
Messages
17
Trusses are almost done
 

Attachments

  • 20140512_143915.jpg
    20140512_143915.jpg
    60.2 KB · Views: 126
OP
S

seymer

Member
Joined
Apr 27, 2014
Messages
17
The steel is going on. I miscalculated the amount of fill needed I need to get that spread then concrete tomorrow, hopefully.
 

Attachments

  • 20140514_103424.jpg
    20140514_103424.jpg
    60.5 KB · Views: 95
OP
S

seymer

Member
Joined
Apr 27, 2014
Messages
17
So, maybe it wasn't such a good deal after all... I need some advice on how to deal with my contractor. The metal siding on my barn is very poorly installed. Lots of scratched up j channel, bent and buckled pannels, screws in the wrong place. I only owe this guy another 3500. What is the best way to handle this situation? I spoke with him today and told him to not do any more work until we r on the same page. I Imagine hes not going to be happy about redoing the metal work. Any advice on how to deal with poor workmanship?
 

Attachments

  • 20140516_120951.jpg
    20140516_120951.jpg
    83.5 KB · Views: 125
  • 20140516_120931.jpg
    20140516_120931.jpg
    78.1 KB · Views: 125
  • 20140516_120334.jpg
    20140516_120334.jpg
    46.5 KB · Views: 132
OP
S

seymer

Member
Joined
Apr 27, 2014
Messages
17
They came back today and fixed and finished the metal work. The only things left now are the concrete and overhead doors. That might be two weeks out.
 

Attachments

  • 20140519_133622.jpg
    20140519_133622.jpg
    46.2 KB · Views: 72
  • 20140519_133549.jpg
    20140519_133549.jpg
    43.7 KB · Views: 68

Texas Aggie

Well-known member
Joined
Mar 23, 2010
Messages
66
Location
Austin, TX
Glad to hear the contractor fixed the metal work. I'm sure you'd prefer that it be done correctly the first time, but the main thing is to get it right in the end. If that's the only issue you run into, I'd say you came out alright.
 
OP
S

seymer

Member
Joined
Apr 27, 2014
Messages
17
Doors are up, all the work I can afford is done for now.
 