cyamaha2007
Well-known member
Hello,
I’m setting up a new construction shop at work and have a question about multi wire branch circuits. I have 10 work benches that need 3 phase 208 and single phase 120.
I want to mount a multi gang box to a Lista cabinet and have a 4 or 5 pin 208 receptacle (my 208 equipment does not use the neutral). And a quad 120 receptacle.
I understand that doing this will load 1 phase unevenly but the 3 phase equipment only pulls 7 amps and the 120 load is to charge cell phones & power tool batteries. Secondly I would use a different leg on the next bench to help balance the phases.
I cannot find any reason this is not legal but 1 electrician says that you cannot use a leg of 208 to neutral to make 120 in the multi gang box.
I’m a machine tool electrician so I’m not the best with the NEC.
I want to use the 5 wire 12 or 14 gauge SO cord I have in stock if possible.
Thanks for your time.


I’m setting up a new construction shop at work and have a question about multi wire branch circuits. I have 10 work benches that need 3 phase 208 and single phase 120.
I want to mount a multi gang box to a Lista cabinet and have a 4 or 5 pin 208 receptacle (my 208 equipment does not use the neutral). And a quad 120 receptacle.
I understand that doing this will load 1 phase unevenly but the 3 phase equipment only pulls 7 amps and the 120 load is to charge cell phones & power tool batteries. Secondly I would use a different leg on the next bench to help balance the phases.
I cannot find any reason this is not legal but 1 electrician says that you cannot use a leg of 208 to neutral to make 120 in the multi gang box.
I’m a machine tool electrician so I’m not the best with the NEC.
I want to use the 5 wire 12 or 14 gauge SO cord I have in stock if possible.
Thanks for your time.


