Got basement window openings prepped and ready to go for windows over the weekend. Still need to work on below grade exterior doors. Got some grade work done. I did not measure but will take pics tomorrow, I would venture it was almost 1.5-2 foot with a lot left to go. We got almost no plumbing done, "is there an easy way to fire your brother (me), and your father?" I was not as helpful as I hoped this weekend. With 3 kids of my own and a wife you have to set priorities. This week everyone goes back to school so I will have a little more free time. I did get a new fan/light hung in "MY" daughters room tonight. That made the house a happy home again. We got several inches of rain last night which helped settle the ground around the foundation getting us closer to doing a driveway and the front stoop is ready to pour over the bomb shelter. Sounds like that should be Tuesday. And the concrete guy stopped by my place tonight to measure for a new driveway and front steps. Tomorrow should be a very eventful day. A big portion of the main floor got painted and is ready to move into if my father and I ever get the plumbing hooked up. I am not looking forward to the heating and A/C. I however have not given my brother "his house" enough credit, I am still unsure how he has not driven his car into the river. If he ever finds this thread he will be not be happy with my spelling, grammar or punctuation. Pics to follow tomorrow, Thanks for following along!!