Hey there team. Long time lurker, first time poster. Tomorrow I have 2 truck loads of lumber and poles arriving to start the construction of my forever shop.
So far we have done a bit of excavation, permit gaining, planning and ordering. It is mid winter here on the other side of the planet so hopefully the dry winter we have been promised stays on track
We bought the property Nov last year and immediately began scheming to get the build underway.
I am Woodbox over on the hamb and have been building a few cars covered on there for a few years now.

20m wide by 11m deep. Each bay will be 6.6m x 11m. Central bay will house the 4 post hoist. Left bay is wood shop and right bay is steel fab/shaping.

Central bay also has floor to ceiling pallet racking both sides.
Each side bay will have a steel beam to support the roof and run a gantry car for lifting to save my back.
stay tuned .......
So far we have done a bit of excavation, permit gaining, planning and ordering. It is mid winter here on the other side of the planet so hopefully the dry winter we have been promised stays on track
We bought the property Nov last year and immediately began scheming to get the build underway.
I am Woodbox over on the hamb and have been building a few cars covered on there for a few years now.

20m wide by 11m deep. Each bay will be 6.6m x 11m. Central bay will house the 4 post hoist. Left bay is wood shop and right bay is steel fab/shaping.

Central bay also has floor to ceiling pallet racking both sides.
Each side bay will have a steel beam to support the roof and run a gantry car for lifting to save my back.