Help please advise am installing a 4 post bend pack lift 14 thousand lbs .The left front post is 2 1/2in out of level the other three are within ¾ of an inch this is because of a drain slope in the area of the left front post.causeing the 2 ½ inch difference .This is my plan place 2x2 x12 inch steel square I/8 tubing welded together .and filled with non shrink grout .under the left front post. And use longer wedge bolts in 4 inch 4000psi concrete floor,any slight voids after leveling the post will be filled with shim and or anchoring epoxy .Have done mock up with plywood under the one post and all post are now under ¾ of an inch of totally being level all the way around. I feel this is good plan but it is what I don't know that scares me that I may not be thinking about sorry for the long post but wanted to be complete in my description please advise or any ideas Thanks in advance Mike
