Contractor and the rain finally came to a mutual but contentious understanding and the theory is that the construction that was supposed to start in Jan is now starting tomorrow.
Shop will be 40x100x16 3:12 under roof.
40x60x16 enclosed.
inside that is a 12x54x9 enclsoed space that will be divided into wood shop and machine shop.
above that with cantilever will be a ~14x60xwhatever is left over apartment/guest space that will hopefully transition into the kids apartment in college.
trying to figure out lighting, how to apply/transport power, and so forth.
main hobby will be creating a pair of 1951/1953 Chevy trucks for/with my girls while also re-doing my 50 4x4 and starting/finishing the family 50 suburban and getting my 51 panel back on the road.
anybody need a (free) job? wow. i should quit my day job.
This is the shop my dad dreamed about but never got to build before he died.
The south slope will also be hosting 70 solar panels putting out ~22kw
ambitious much?
only pic right now is grass, red clay, and sawdust from the tree I removed.
Shop will be 40x100x16 3:12 under roof.
40x60x16 enclosed.
inside that is a 12x54x9 enclsoed space that will be divided into wood shop and machine shop.
above that with cantilever will be a ~14x60xwhatever is left over apartment/guest space that will hopefully transition into the kids apartment in college.
trying to figure out lighting, how to apply/transport power, and so forth.
main hobby will be creating a pair of 1951/1953 Chevy trucks for/with my girls while also re-doing my 50 4x4 and starting/finishing the family 50 suburban and getting my 51 panel back on the road.
anybody need a (free) job? wow. i should quit my day job.
This is the shop my dad dreamed about but never got to build before he died.
The south slope will also be hosting 70 solar panels putting out ~22kw
ambitious much?
only pic right now is grass, red clay, and sawdust from the tree I removed.